Building the Nation, Safely.
Major civil infrastructure projects—tunnels, bridges, rail corridors, and highways—rely on ultra-heavy lifting. These operations frequently take place in the public domain, where the margin for error is non-existent. A compliance failure here doesn't just delay a project; it halts a city.
Cranes Australia partners with joint ventures and civil contractors to secure the lifting compliance on state and federal infrastructure projects. We verify the heavy-lift crawlers, test the custom spreader beams used for bridge girders, and provide independent engineering oversight that satisfies the stringent demands of government transport authorities.
Regulatory Environment
- State Transport BodiesCompliance with TfNSW, VicRoads, and TMR lifting specs
- AS2550.5Safe use of mobile cranes in complex lifts
- Rail Safety National LawONSR requirements for lifting over or near rail corridors
Key Challenges
The specific risks of heavy civil construction.
Public Interface
Infrastructure lifting often occurs over active roadways or rail lines. The liability profile for a dropped load is immense.
Government Oversight
Projects funded by bodies like Transport for NSW or VicRoads mandate strict, non-negotiable engineering compliance.
Heavy Tandem Lifts
Bridge beams and tunnel segments require complex, multi-crane lifts that demand perfect structural verification.

Services for Infrastructure
Heavy-duty verification for heavy civil operations.
Mobile Crane Verification
Statutory inspections for high-capacity crawler and mobile cranes.
Explore ServiceWhy Cranes Australia?
Experience managing compliance for massive 600t+ crawler cranes used in civil works.
Capability to perform large-scale proof load testing of custom bridge-beam spreaders.
Independent engineers trusted by state rail and road authorities.
Fast-track certification to ensure weekend road-closure lifts go ahead as planned.
Scenario in Action
"A civil joint venture had a 12-hour weekend rail occupation window to lift a 180t pedestrian bridge into place using two 400t crawlers. The week before, the custom lifting beam was modified. Cranes Australia mobilized immediately, performed NDT on the new welds, executed a 225t proof load test on site using water bags, and issued the engineering cert 48 hours before the lift."