Skip to main content
CRANES AUSTRALIA

Safety & Operations

Lifting Gear Inspection Log Generator

An inspection register for chains, slings, shackles and lifting attachments.

How this works: add every piece of lifting gear with its ID, WLL, last inspection date and inspection frequency (slings are commonly 3-monthly). We work out the next-due date and flag anything overdue, due within 30 days, or quarantined. Print the register or export it to CSV for your records.

Lifting Gear Inspection Register

Item typeID / serialWLLLast inspectionFreq (mo)Next dueConditionStatus
Chain sling3Serviceable
Set date

Inspect gear before each use and have it thoroughly examined by a competent person at the intervals set by the manufacturer and AS 2550 / relevant standards. Remove damaged gear from service immediately.

General guidance only. This tool gives indicative results from the numbers you enter. It is not engineering advice, a compliance assessment or a substitute for a competent person, AS 2550 requirements or your crane manufacturer's documentation. Verify anything safety-critical with a qualified professional before acting on it.

Talk through the requirement

Need a crane inspection?

Share the equipment type, location and inspection history so the right service pathway can be confirmed.